Website-Rabatte bis zu 30 %

LesDiy wünscht allen ein erfolgreiches und glückliches Jahr 2026!

🎉 Designer Support Week: 20 % Rabatt auf alles – Code: DESIGNER20 | Unterstütze originale MOC-Designer

DESIGNER20

MOC-186954 Nuclear Submarine TYPHOON | Project 941 Akula - 1:300 scale clamping blocks

LesDiy  |  SKU: 3575175
Designer: DarthDesigner
Product PCS: 1434
After-sales service: Free spare parts
Tips: Printed parts and minifigures are not included
€94,99
Tax included Shipping calculated at checkout.


Logistikkosten

Derzeit können wir Zollabfertigungsdienste in den meisten EU-Ländern anbieten. Die Länder sind wie folgt: Frankreich, Deutschland, Italien, Niederlande, Belgien, Irland, Vereinigtes Königreich, Dänemark, Griechenland, Spanien, Portugal, Finnland, Schweden, Österreich, Polen, Tschechische Republik, Ungarn, Slowakei, Zypern, Rumänien, Bulgarien.
Kostenloser Versand innerhalb Deutschlands und Österreichs (inkl. Zollabfertigung). 
Die Schweiz (unter 5 kg) kann auch Zollabfertigungsdienste anbieten. Die Versandkosten in die Schweiz und in andere Länder entnehmen Sie bitte der Tabelle unten. Schweiz

0-5kg €20.00
5-6kg €34.00
6-8kg €42.00
8-10kg €52.00
10-12kg €62.00
12-14kg €70.00
14-16kg €75.00
16-18 kg €85.00
18-20 kg €90.00
20-22 kg €90.00
22-24kg €90.00
24-30kg €100.00
30kg+ €150.00

United States

United States €30.00

Canada

Canada €30.00

Norwegen

Norwegen €15.00

Niederlande

Niederlande €10.00

Luxembourg

Luxembourg €10.00
  • Designed and authorized by DarthDesigner, this TYPHOON | Project 941 Акула nuclear submarine set is inspired by the former Soviet nuclear submarine. The product has been revised and checked many times to ensure a reasonable, robust structure and an excellent building experience.

  • The Typhoon-class submarine, Soviet designation Project 941 Akula (Russian: Акула, meaning "shark"), NATO reporting name Typhoon, is a class of nuclear-powered ballistic missile submarines designed and built for the Soviet Navy. With a submerged displacement of 48,000 tons, the Typhoon class is the largest submarine ever built. It can provide comfortable living accommodations for 160 crew members underwater for several months. The origin of the NATO reporting name is unclear, but it is often claimed to be related to a 1974 speech by General Secretary Leonid Brezhnev in which he used the word "Typhoon" (тайфун) to describe a new type of nuclear missile submarine in response to the U.S. Navy's new Ohio-class submarines.
    In March 2012, the Russian Navy scrapped plans to modernise the Typhoon-class submarines, arguing that the cost of modernising one Typhoon-class submarine would be equivalent to building two new Borei-class submarines. Three Typhoon-class submarines were decommissioned in the 1990s and scrapped in the 21st century, and two more were decommissioned and are currently in reserve. In September 2012, Russia announced the decommissioning of the last R-39 Rif (SS-N-20 Sturgeon) submarine-launched ballistic missiles, leaving only one Typhoon-class submarine, the Dmitry Donskoy, in service. This submarine was modified to test the more modern RSM-56 Bulava submarine-launched ballistic missile. It remained in service until its decommissioning in February 2023.

🎆 Neujahrsaktion – Häufige Fragen

1) Sind die MOC-Modelle offiziell vom Designer autorisiert?
→ Ja. Alle LesDiy MOC-Sets werden mit der ausdrücklichen Genehmigung der jeweiligen Designer produziert und verkauft. Die Rechte der Designer werden vollständig respektiert.

2) Was kann ich tun, wenn Teile fehlen oder beschädigt sind?
→ Sollten Teile fehlen oder beschädigt sein, bieten wir für alle LesDiy Sets einen kostenlosen Ersatzteil-Service an. Bitte kontaktieren Sie uns mit Ihrer Bestellnummer und der Teileliste.

3) Wie kann ich den Kundenservice nach dem Kauf kontaktieren?
→ Unser Kundenservice ist jederzeit per E-Mail erreichbar: lesdiyde@gmail.com. In der Regel antworten wir innerhalb von 24–48 Stunden.

4) Wie lange dauert der Versand während der Neujahrsaktion?
→ Die reguläre Lieferzeit beträgt ca. 25 Werktage. Aufgrund des erhöhten Bestellaufkommens zum Jahreswechsel kann es zu leichten Verzögerungen kommen.

5) Kann ich meine Bestellung nachträglich stornieren?
→ Eine Stornierung ist möglich, solange die Bestellung noch nicht in Produktion ist oder versendet wurde. Bitte kontaktieren Sie uns so schnell wie möglich per E-Mail.