MOC-186954 Nuclear Submarine TYPHOON | Project 941 Akula - 1:300 scale clamping blocks
MOC-186954 Nuclear Submarine TYPHOON | Project 941 Akula - 1:300 scale clamping blocks is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Logistikkosten
Logistikkosten
Derzeit können wir Zollabfertigungsdienste in den meisten EU-Ländern anbieten. Die Länder sind wie folgt: Frankreich, Deutschland, Italien, Niederlande, Belgien, Irland, Vereinigtes Königreich, Dänemark, Griechenland, Spanien, Portugal, Finnland, Schweden, Österreich, Polen, Tschechische Republik, Ungarn, Slowakei, Zypern, Rumänien, Bulgarien.
Kostenloser Versand innerhalb Deutschlands und Österreichs (inkl. Zollabfertigung).
Die Schweiz (unter 5 kg) kann auch Zollabfertigungsdienste anbieten. Die Versandkosten in die Schweiz und in andere Länder entnehmen Sie bitte der Tabelle unten. Schweiz
| 0-5kg | €20.00 |
| 5-6kg | €34.00 |
| 6-8kg | €42.00 |
| 8-10kg | €52.00 |
| 10-12kg | €62.00 |
| 12-14kg | €70.00 |
| 14-16kg | €75.00 |
| 16-18 kg | €85.00 |
| 18-20 kg | €90.00 |
| 20-22 kg | €90.00 |
| 22-24kg | €90.00 |
| 24-30kg | €100.00 |
| 30kg+ | €150.00 |
United States
| United States | €30.00 |
Canada
| Canada | €30.00 |
Norwegen
| Norwegen | €15.00 |
Niederlande
| Niederlande | €10.00 |
Luxembourg
| Luxembourg | €30.00 |
-
Designed and authorized by DarthDesigner, this TYPHOON | Project 941 Акула nuclear submarine set is inspired by the former Soviet nuclear submarine. The product has been revised and checked many times to ensure a reasonable, robust structure and an excellent building experience.
-
The Typhoon-class submarine, Soviet designation Project 941 Akula (Russian: Акула, meaning "shark"), NATO reporting name Typhoon, is a class of nuclear-powered ballistic missile submarines designed and built for the Soviet Navy. With a submerged displacement of 48,000 tons, the Typhoon class is the largest submarine ever built. It can provide comfortable living accommodations for 160 crew members underwater for several months. The origin of the NATO reporting name is unclear, but it is often claimed to be related to a 1974 speech by General Secretary Leonid Brezhnev in which he used the word "Typhoon" (тайфун) to describe a new type of nuclear missile submarine in response to the U.S. Navy's new Ohio-class submarines.
In March 2012, the Russian Navy scrapped plans to modernise the Typhoon-class submarines, arguing that the cost of modernising one Typhoon-class submarine would be equivalent to building two new Borei-class submarines. Three Typhoon-class submarines were decommissioned in the 1990s and scrapped in the 21st century, and two more were decommissioned and are currently in reserve. In September 2012, Russia announced the decommissioning of the last R-39 Rif (SS-N-20 Sturgeon) submarine-launched ballistic missiles, leaving only one Typhoon-class submarine, the Dmitry Donskoy, in service. This submarine was modified to test the more modern RSM-56 Bulava submarine-launched ballistic missile. It remained in service until its decommissioning in February 2023.
LesDiy
Zimmer 1101D, 11. Stock, Lippo Sun Plaza
28 Canton Road, Tsim Sha Tsui, Kowloon Hongkong
lesdiyde@gmail.com
Ersatzteile für fehlende oder beschädigte MOC-Steine
Wenn Sie fehlende oder beschädigte Teile Ihres MOC-Steinsets erhalten haben, gehen Sie bitte wie folgt vor:
Erforderliche Informationen:
- Bestellnummer
- Fehlendes Teil (Teilenummer laut Anleitung)
- Benötigte Menge und Farbe
- Foto des fehlenden Teils oder Beutels
So beantragen Sie einen Ersatz:
Senden Sie die Informationen per E-Mail an: lesdiyde@gmail.com
Wir werden Ihre Anfrage innerhalb von 1–3 Werktagen prüfen und die Ersatzteile so schnell wie möglich versenden.
Vielen Dank für Ihr Verständnis und viel Spaß beim Bauen!
Place an order of € 100 or more to join
€ left to join the raffle.
This purchase will grant you a ticket to the raffle 😎
Enter your info to join
Optional explanations for the prize
🎆 Häufig gestellte Fragen
1) Sind diese MOC-Modelle offiziell von den Designern lizenziert?
→ Ja. Alle LesDiy MOC-Bausätze werden mit der ausdrücklichen Genehmigung der jeweiligen Designer hergestellt und verkauft. Wir respektieren die Urheberrechte der Designer uneingeschränkt.
2) Wie lange dauert die Lieferung?
→ Die Standardlieferzeit beträgt ca. 25 Werktage.
3) Kann ich meine Bestellung nach der Aufgabe stornieren?
→ Sie können Ihre Bestellung stornieren, solange sie noch nicht in Produktion gegangen oder versandt wurde. Bitte kontaktieren Sie uns so schnell wie möglich per E-Mail.







